Renewal and Extension of "Cereirede" Wastewater Treatment Plant
Project Facts
- Client:
- District de l’Agglomération de Montpellier
- Number of people:
- 15
- Number of man-months:
- 350
- Approximate value of services:
- 6,657,442 €
- Skill staff provided:
- Wastewater Treatment Expert
Hydraulics Expert
Civil Works And Underground Works Experts
Electro-mechanical Expert
Works Supervision Engineer
- Wastewater Treatment Expert
- Place:
- France - Montpellier
- Starting date:
- 1996
- Completion date:
- December 2004
Project description
Extension of the wastewater treatment plant up to 470,000 equiv-inhabitants capacity (130,000 m³/d - 4 m³/s max.), with following performances: SS: 35 mg/l ; COD: 125 mg/l; BOD5: 25 mg/l.
Main components of the wastewater treatment process:
- Pumping station
- Pretreatment (4 m³/s): grit removal, oil and sand separation
- Storage & regulation basin: 25 000 m³
- Heavy load activated sludge treatment followed by a biofiltration (1,5 m³/s)
Main components of the sludge treatment process:
- Sludge thickening by gravity and by flotation
- Anaerobic thermophilic digestion
- Centrifuge dewatering
- Reuse for agriculture
Air treatment of all odor sources: 3 chemical scrubbers Total amount of works: 101 M€
Services provided
Complete Project Management: feasibility, preliminary design, environmental impact assessment, tender documentation on the basis of a "plant design & build" procedure, analysis of bids, assistance for the preparation of the works contract, works supervision, commissioning, trial tests follow-up.
In addition for the discharge transfer & sea outfall : detailed design, execution drawings and specifications
Works in progress.